T
Tendix SA Construction Pricing Intelligence
Free Beta · Built for SA Contractors

Upload a quote.
Get your BOQ in seconds.

If you didn't check the price on Tendix, you don't know the price.
Upload supplier quotes — we extract the rates, build your BOQ, and flag every line that's off-market.

Upload quotes
Excel, CSV — rates extracted instantly
70+ items
Earthworks · Concrete · Pipework · Roads · Building · Electrical · Fencing
Free
No login. No card. Use it on your next tender.
Pro
AI estimates · Tender Review · Team sharing (coming soon)

Free download — Tender Submission Checklist

PDF · A4 · 8 pages Every mandatory document, technical pack item, and submission-day check on one printable list. Use it on your next bid.

Download checklist (PDF)
Free Beta
Upload quotes. Get your BOQ. Upload supplier quotes — rates are extracted instantly. Or paste / scan a printed PDF.
↓ Submission checklist (PDF) About →

Step 1 — Upload quotes or bring in your BOQ

Free

Upload one or more supplier quotes (Excel / CSV). We'll extract every priced line, match items to your BOQ, capture supplier details, and build your rate comparison automatically.

📎
Drop supplier quotes here, or click to browse
Accepts .xlsx, .xls, .csv · Multiple files supported · Up to 5 MB each
After uploading, Tendix extracts every priced line, adds suppliers to your database, and can generate a rate-request email to each supplier automatically.

Step 2 — Price your lines

0 lines

No BOQ loaded yet.

Paste a table, upload a file, or load the sample to get started.

Yellow rate = below the AI band (you may be under-priced and win-but-lose). Red rate = above the AI band (you may be over-priced and not get the work).

Step 2b — Compare supplier quotes Optional

Upload supplier / sub-contractor quotes (Excel or CSV). We'll match each quote line to your BOQ by description and show you the cheapest quote per line, plus how each compares to the market band.

📋

No quotes uploaded yet — upload one to compare.

Step 3 — Markup & margin

10%
5%
0%
i Overhead — your indirect running costs

Two ways to handle overhead in a SA tender:

1. Spread across rates — Type your real running costs (e.g. R100 000/month × 4 months = R400 000). The tool converts that to a % of your direct subtotal and bakes it into every line. Use this when the tender BOQ has no P&G section.

2. Place in a BOQ line — Most SA paper tenders have a fixed line for P&G (often 1.1.1 Contractual Requirements). Type the R-amount into that BOQ row's rate yourself, then tick the box below. The tool keeps the figure here for reference but doesn't add it again — preventing a double-count.

The Insert as P&G line item button (appears in the warning) inserts a row for you and auto-ticks the box.

R
Type your real running costs (e.g. R100 000/month × 4 months) — we’ll convert it to a per-line uplift automatically.

Tender summary

Direct cost (qty × rate)R 0
+ Line markupsR 0
+ Overheads (slider)R 0
+ Profit (slider)R 0
+ Contingency (slider)R 0
All-in subtotalR 0
Tender totalR 0
Each slider is added directly into every line's rate — e.g. a 5% markup means price × 1.05. The line totals in the grid above already include markup, overheads, profit and contingency.

Step 4 — Schedule Summary & Consistency Check

Pro feature — free during beta
📊
Schedule Summary & Consistency Check — SA industry weighting bands, per-schedule breakdown, and anomaly flags. Free during beta. Pro feature at launch.

SA tender BOQs typically end with a per-schedule summary so the client can see the cost split. This panel mirrors that table and flags any schedule whose share of the contract value falls outside accepted SA construction-industry weighting bands.

📊

Mark rows as Schedule headings (gold rows in the grid) to see the per-schedule breakdown here.