Step 1 — Upload quotes or bring in your BOQ
FreeUpload one or more supplier quotes (Excel / CSV). We'll extract every priced line, match items to your BOQ, capture supplier details, and build your rate comparison automatically.
Imported quotes
Step 2 — Price your lines
0 linesNo BOQ loaded yet.
Paste a table, upload a file, or load the sample to get started.
Step 2b — Compare supplier quotes Optional
Upload supplier / sub-contractor quotes (Excel or CSV). We'll match each quote line to your BOQ by description and show you the cheapest quote per line, plus how each compares to the market band.
No quotes uploaded yet — upload one to compare.
Step 3 — Markup & margin
Tender summary
Step 4 — Schedule Summary & Consistency Check
Pro feature — free during betaSA tender BOQs typically end with a per-schedule summary so the client can see the cost split. This panel mirrors that table and flags any schedule whose share of the contract value falls outside accepted SA construction-industry weighting bands.
Mark rows as Schedule headings (gold rows in the grid) to see the per-schedule breakdown here.
| Schedule | Title | Lines | Subtotal (R) | % of total | Industry band |
|---|---|---|---|---|---|
| Sub Total 1 (sum of all schedules) | R 0 | ||||
| + Contingencies (slider) | R 0 | ||||
| + Overheads + Profit (sliders) | R 0 | ||||
| Sub Total 2 | R 0 | ||||
| + VAT (15%) | R 0 | ||||
| TOTAL CONSTRUCTION COST | R 0 | ||||